Wellness

Cognitive Performance Assessment Device.

Circl proved their concept in beta — then real orders started arriving with no way to build at volume. We re-engineered the device for assembly so they could scale without burning cash on inventory.

25%

Assembly time

Build time cut to a quarter of the original design.

Plug & Play

Assembly skill

Light assembly only — no soldering or electronics.

50%

Inventory cost

Freed cash by holding components, not finished goods.

The ask

“We’ve got potential orders we can’t fill — we need 100 units in 3 months, and no inventory to do it.”

Client

Circl · circlbrain.com

Industry

Wellness / Neurotech

Services

Design for assembly, manufacturing ramp

Engagement

Product Dev → NPI

Timeline

~3 months

Problem

Beta success created a fulfillment problem overnight: orders were coming, but building finished units to stock meant tying up scarce cash in inventory against long component lead times.

Insight

The real constraint wasn’t build speed — it was where inventory was held. Hold flexible components instead of finished goods and the cash-flow math changes completely.

Solution

We redesigned the device for assembly around three moves:

  • Minimal changes to a proven, performance-critical design
  • Modular subassemblies that build in parallel
  • Yield improvements that de-risk the ramp

“Ampersand is the best we’ve worked with. They understood our needs completely, and the results were beyond my expectations.”

Nolan Biese, PhD — CEO, Circl

Ready to solve a better problem?

Come in where your idea actually needs refining.

Let's talk →

Next case study

Radiopharma Infusion Device

241% · 2 yrs · $0