Wellness
Cognitive Performance Assessment Device.
Circl proved their concept in beta — then real orders started arriving with no way to build at volume. We re-engineered the device for assembly so they could scale without burning cash on inventory.

25%
Build time cut to a quarter of the original design.
Plug & Play
Light assembly only — no soldering or electronics.
50%
Freed cash by holding components, not finished goods.
The ask
“We’ve got potential orders we can’t fill — we need 100 units in 3 months, and no inventory to do it.”
Client
Circl · circlbrain.com
Industry
Wellness / Neurotech
Services
Design for assembly, manufacturing ramp
Engagement
Product Dev → NPI
Timeline
~3 months
Problem
Beta success created a fulfillment problem overnight: orders were coming, but building finished units to stock meant tying up scarce cash in inventory against long component lead times.
Insight
The real constraint wasn’t build speed — it was where inventory was held. Hold flexible components instead of finished goods and the cash-flow math changes completely.
Solution
We redesigned the device for assembly around three moves:
- Minimal changes to a proven, performance-critical design
- Modular subassemblies that build in parallel
- Yield improvements that de-risk the ramp
“Ampersand is the best we’ve worked with. They understood our needs completely, and the results were beyond my expectations.”
Nolan Biese, PhD — CEO, Circl